Finally.... another update

Posted by Folkestad | Posted on 8:05 AM

0

I apologize for the LONG delay in getting up new information about the building process.  Here are a few pictures  to give you a quick update.

Above: Siding is now going up!  Once the siding is complete, it will be painted.  The outside of the building is beginning to look more "complete."

Above:  Here you see the ceiling of the new sanctuary.  The "cloud system" is currently being installed.  These panels will make up the ceiling.  The lights will also be in these "clouds."  You will also notice that the ceiling has been painted black (much of which you will not see once the panels are in place.




Update

Posted by Folkestad | Posted on 2:49 PM

0

Progress continues on the building.  On the outside, the peeked roof has been shingled, the flat roof is basically complete.  Inside work continues upstairs framing in the upstairs bathrooms, new plumbing has gone into the downstairs bathroom, framing in the windows in the sanctuary and fellowship hall, among other things.

We will try and get some updated pictures up on this blog soon.  Again, if you have any questions, or would like to see pictures of any specific aspect of the new building, leave a comment or send an email to chris@stcroixalliance.com.

Thanks for stopping by!

Risers are in!

Posted by Folkestad | Posted on 8:04 AM

0

The risers and stairs are now in and the stairs have been poured.  The "structure" of the sanctuary seating is now in place.  We will try to get a video up on the blog soon to give a better idea of what is taking place inside.  


If you've driven by the church this week, you noticed that the building is being prepped for the siding and that the windows are now in.  We should continue to see changes to the outside of the building over the next couple weeks.  

Are there questions you have about the building progress?  Any pictures you'd like to see?  Leave a comment and we will do our best to answer questions or provide pictures of the parts of the building you would like to see.

a little picture update

Posted by Folkestad | Posted on 1:08 PM

0

Here is a quick video of some of the progress so far.  This is the video that was played before the informational meeting on February 21st.




Here is a video tour with Randy.

New Spancrete Inside

Posted by Folkestad | Posted on 7:11 AM

0

The week construction crews are working on expanding the upper level floor.  Spancrete has been put in place covering the old stairway as well as expanding out into the "gym" area infront of the new elevator.  Pictures below.

Above: this is a picture from the fellowship hall looking at the new spancrete.  On the right is the former stairway to the basement.  Where you can see the sun coming in is the new elevator shaft and stairway. 

Above: this is a picture of the spancrete in front of the new elevator.  This expands over the former door into the gymnasium.  The upper level floor space has increased significantly.

Above: this is a picture of the spancrete over the former stairway.  

Above: this is a picture looking into the sanctuary looking at the steel riser structure.  This is the beginning of the riser structure.  More steel and spancrete will be brought in soon to create the riser "stadium seating" structure.

Please continue to pray for the construction work, as well as the workers.  They will soon be working on bringing in the spancrete for the risers in the sanctuary.  Pictures will follow.  

New Video Tour

Posted by Folkestad | Posted on 2:29 PM

0


Here is the latest video update of the building.  


It's starting to come together!

Posted by Folkestad | Posted on 3:48 PM

0


A video tour of the new construction. Remember... I am a youth pastor, not a construction expert. Sorry if I mess up any terms :) The building is really starting to take shape!


Below are a few pictures of the interior of the building. You will notice the HVAC and sprinkler system in the ceiling, as well as the framing of the fellowship hall.




Below: the roof structure is going up!  The outside should take shape in the next day or so.


HVAC, Sprinkler system and Electrical.



So there you have it... things are really moving along quickly!