New Spancrete Inside
Posted by Folkestad | Posted on 7:11 AM
The week construction crews are working on expanding the upper level floor. Spancrete has been put in place covering the old stairway as well as expanding out into the "gym" area infront of the new elevator. Pictures below.
Above: this is a picture from the fellowship hall looking at the new spancrete. On the right is the former stairway to the basement. Where you can see the sun coming in is the new elevator shaft and stairway.
Above: this is a picture of the spancrete in front of the new elevator. This expands over the former door into the gymnasium. The upper level floor space has increased significantly.
Above: this is a picture of the spancrete over the former stairway.
Above: this is a picture looking into the sanctuary looking at the steel riser structure. This is the beginning of the riser structure. More steel and spancrete will be brought in soon to create the riser "stadium seating" structure.
Please continue to pray for the construction work, as well as the workers. They will soon be working on bringing in the spancrete for the risers in the sanctuary. Pictures will follow.